Wednesday, December 12, 2007

WEDNESDAY SWELL 12/05/07 (Part II)

.
Back down in Ventura for the afternoon session— a more stress free crowd and open minds.
.
.
JBrother, maker of films "Adrift" and "Longer", steppin' stones.
.

.
Dan Malloy opted for a first session on his Alaia shaped by Tom Wegener— finless, solid wood, roughly one inch thick.
.
.
Dan, Alaia in the pocket (w/ enlargements).
.
.
Post Alaia session stoke.
.
.
Jenkins, fiberglass drum maker and top of the point barrel seeker.
.
.
Tom Curren, on the scene. Sorry, no other shots of the man. The cap was attached to his wetsuit zipper string. He'd knock it off his head after dropping in and let it dangle behind him as he rode down the line.
.
.
Dan, second session thrusting.
.
.
Two unidentified.
.

.
.
JBrother, on his way...
.
.
...to performing simple arithmetic: 3 pelicans + 1 JBrother = 4 pelicans.
.
.
Homeward bound...
.

.
.

Monday, December 10, 2007

FLASHBACK

.
The spot in yesterday's post exactly one year ago yesterday.
.
The Master of Ceremonies.
.
.
.

Sunday, December 9, 2007

BRISK WIND

.
Felt like Winter arrived in these parts to me today. As friend said to me while looking to the East then West horizon, "Clear as a bell".
.


.
Sequence 1 of unknown:

.
Sequence 2 of unknown:

.
.

Saturday, December 8, 2007

LAST NIGHT AT SHELTER SURF SHOP...

.
...The Growlers playing live to a projection of a trailer for the "The Tyler Warren Experiments" a film by John Smart expected to release Summer 2009.
.


.
.

Thursday, December 6, 2007

WEDNESDAY SWELL 12/05/07 (Part I)

.
Pre-dawn Ventura arrival.
.

.
Waited for wave check by light, then kept headin' North...
.
.
to this well known, heavily crowded grinder.
.
.
The kid in the sequence below said it took him three hours to luck into this set wave.
.

.
.

Sunday, December 2, 2007

NINE LIGHTS 5'5" QUAD (In the works #2)

.
Got back into the shaping bay with Jeff today:


3/32" balsa panels are vacuum bag adhered to the deck and bottom of the shaped 1 lb. EPS core with epoxy (for deck support/strength there is one layer of 4oz. glass between the EPS and balsa deck panels; no glass between bottom panels and EPS).

Once epoxy has set the board is removed from vacuum bag and the excess balsa hanging off the rail is ground off to reclaim the smooth rail line for scribing tool.

The rails are then cut off along the scribed line and planed.

(Video camera running in these shots— I'm working on video documentation of Jeff's shaping process. It will post on the Nine Lights blog in a month or so)

The board is now ready to have balsa added to the rails, the rails turned, all foiling fine tuned, and then epoxy glass job.

I'll update with next session.
.
.